June 3, 2009

Exciting Plumbing photos for all our fans out there




The propane on demand hot water heater
The "long drop" gravity discharge holding tank. Diane insists that such vulgarity as actually seeing your own excrement drop into the tank is simply "not done" and wants to fit a nice curtain around it.


Evan takes apart a perfectly good Spectra watermaker, with automated timer, automated fresh water flushing, automated salinity detector and more relays, solenoid valves etc. than Chernobyl. He replaces all this with a few extra manual valves and little handheld TDS meter you put under a spigot to test the water. This is the same sort of system as the Volvo RTW race boats use - nothing electrical or electronic to go wrong. Except about 70 pipe joints....

March 23, 2009

More work in progress:

Little lockers at the head of our berth. You know, things you might like when you get up in the morning. Di informs me it will be for jewelry and the like. Oh well.



Radar display, fan, stereo. It's nice to have music when I'm working - but when you're painting for 2-1/2 hrs, it's hard to change a CD! Must get that iPod hooked up soon.

March 17, 2009

I also have the stereo installed w. outdoor speakers under the stern arch. But they are 8 ohm impedance and not as loud as the 4 ohm car type in the cabin. Still nice to have tunes inside and out - and not have to worry about kicking the cord of the boom box out of the power bar all the time.

Solar panels added to the stern arch. 375 watts of 'em. Woo hoo. That should run a fan or two.

February 1, 2009



Ikea Locker Bins

Maia's bedroom built in custom furniture - bins from Ikea. Not too classy in the world of raised panel yacht joinerwork, but easy to clean, super lightweight and cheap. And you can swap the coloured bins around when the mood strikes.

December 15, 2008


Ah, a new windlass is installed. Got to take a picture before it gets all scratched up and dirty. The deck is rather mossy, though, isn't it?

October 29, 2008


Stern Arch with GV10 Dinghy from www.bateau2.com (I design these as a sideline)

September 24, 2008

The new fiberglass ladder/carbon windsurfing mast arch. Going to be used for solar panels and hanging the dinghy under (like davits). Uh, we're going to paint the ladder :)


Tubing joint detail up close. The joint is made with thin strips of carbon uni wrapping around both tubes like a lashing or a bandage. Then peel ply and overlapping layers of electrical tape inside out



I bought a few charts.... about 1000. That's not all of them. The total stack is about 4' high and about 500 lbs at least. It filled the car trunk, the entire back seat and front passenger seat. Took hours to move it was so heavy.

July 7, 2008

Interior has got a 2nd coat of paint. It's good to leave this until most interior epoxy jobs have been done - as it hides the epoxy hand prints I leave in random locations.

The table has been given a few coats of varnish and is starting to look good.


May 31, 2008

Random Progress pictures


Lifelines and Stanchions

Lifeline detail


Reefing Lines on cabin top


A cleaned up galley


April 13, 2008

Some random shots of progress on the boat:

a CLEAN Foredeck. Note the obligatory watercolours in the plastic bin and of course the crab trap.



New composite handrails. Much lighter than stainless steel, and lots cooler in hot tropical sun.


:

Head Door - for privacy, and containment of smells when EVAN uses the head



New 12' wide traveller track. It's bolted to a fiberglass channel, and the channel is glued and glassed to the aft beam.